Receiving Preparation Only · Confirm Location, Access, Unloading and Recipient with Responsible Parties
CargoBintuluRECEIVE / 15
OPEN DATUMB.01Unloading space
BM
B.01 / RECEIVING MAP

Unloading-space worksheet

Arrival does not create an unloading plan. Keep space, equipment and labour as separate confirmations.

B.01 · ILLUSTRATIVE PREPARATION
RESPONSIBILITY LINE

Stop when a current answer is missing.

CargoBintulu does not own or operate Bintulu Port, a terminal, warehouse, carrier, vehicle, equipment, workforce or receiving facility. Confirm regulated status, entry, fit, appointment, unloading and acceptance with the parties responsible for the actual movement.